Akela Constructions transformed the landscaping at the front of the school (completed July 2018) removing the existing tired grass, damaged pathways, trees and garden beds and replacing with a clean fresh concreted area and new covered walkways complete with security lighting.

The 30 lineal metres of cantilevered walkways were hot dip galvanised steel frames with Trimdek roofing iron and COLORBOND® gutters. There was approx 139m2 of plain broom finished concrete and 228m2 of coloured broom finished concrete laid, and the walkway lighting was connected to the existing security light circuit.