Covered Walkways at Labrador State School were installed January to April 2017. We got great feedback from Sharyn, the Business Service Manager at Labrador:

“We are so happy with the result of the walkways.  Each time we have had a project at Labrador, your staff manage safety for staff and students, noise management, and communication so professionally and this really assists me in ensuring that the project goes smoothly.”

Labrador Walkways

This project included the installation of footings, walkway frames, roof sheeting, guttering and down-pipes. There were 56 metres of walkways at 2.4m wide and a small covered area 3.5m x 3.6m and 3m high. The walkways included external lighting every 3 metres. It included removing trees and garden beds and installing new garden beds, removing concrete paths and installing new concrete paths.